A planning defines how much time an employee is scheduled to spend on a project or one of its tasks during a period. You create it through the Add planning button or by dragging the bar directly on the timeline. This article describes the fields of the form, the validation messages, editing directly in the board, and planning with placeholders. The structure of the view itself is explained in Planning Views – Resource Planning.
Note: This article describes the new Resource Planning, which appears in ZEP as the main menu item Planning. If your main menu also contains Work packages, you are still working with the previous resource planning. Its features are described in Feature Overview – Scheduling and Work Packages.
Creating a Planning
The form guides you from top to bottom: first the period, then the people and projects involved, with tasks shown the planning level, and finally the value. Depending on the view you open the form from, the person or the project is already set.
Period and Working Days
In Period from and Period To you define the duration. Both fields correct each other so that the end never falls before the start. ZEP calculates the Working days field from this. It takes weekends, public holidays, and the standard working time of the person into account, so you see immediately across how many days your value is actually spread.
Choosing Employees and Projects
From the employee view you choose one or more projects, from the project view one or more people, plus the project's placeholders. Two toggles help with the selection: Show only projects with open planned hours and Show only employees with capacity. When you edit an existing planning, the window is titled Edit Planning followed by the name of the planning. Employee and project appear there as plain text and cannot be changed, because a planning belongs firmly to that combination. In the single views, ZEP hides both entries because the view itself already shows them.
Note: You can plan several people on one project or one person on several projects. Several people and several projects at the same time are not possible because the value could then no longer be assigned unambiguously.
Planning on the Project or a Task
This requires that the project shows its tasks. This is possible if planning on tasks is allowed. Projects that already show their tasks display the field even while the setting is switched off. How to show the tasks is described in Planning Views – Resource Planning. The form then contains the field Planning level. With Project: [name] you plan on the project itself, or you choose a task from the task tree instead. Only tasks whose status allows bookings are offered. In the employee views, the tasks the person is assigned to or already planned on come first. If you plan on several projects at once from the employee view, the field is not shown. If the chosen task only admits assigned employees, ZEP assigns the planned person to the task for the period, provided you may maintain the project members. Otherwise ZEP points out that the assignment is still missing.
When you create a planning, the form shows the field only if the tasks of the project are shown. When you edit an existing planning, you can also choose a task in a project whose tasks are hidden, provided you may show the tasks of that project yourself. ZEP then shows the task level when you save. In the view Project planning, the field is locked when you edit a planning. The hint Change planning level in the single project view points to the planning on the project detail page.
Planning in Percent, Hours or Person Days
Under Planning you choose how to enter the value:
Percent: share of the person’s daily standard working time, up to 200 per cent.
Hours: next to it you choose Over the period or Daily. Over the period is the total for the whole period, which ZEP spreads over the working days. Daily is a fixed value per working day.
Person days: a total for the whole period that ZEP spreads over the working days. How many hours a person day has is set under Administration > Employees > Settings on the General tab in the field Total: person-days (PD) correspond to.
You can also calculate in the value field, for example 3*8 or 40/5. The operators +, -, * and / are allowed, with multiplication and division before addition and subtraction. ZEP inserts the result as soon as you leave the field or press Enter. If the entry is neither a number nor a valid calculation, ZEP shows Please enter a number or a calculation using +, -, * or /. and saving stays blocked.
If a value exceeds the permitted maximum, ZEP says so immediately and blocks saving.
ZEP remembers for each user the planning type they last used to save a new planning, for example Hours with Daily. The next new planning opens in that type again. An existing planning always opens in its own type when you edit it.
Splitting a Value Across Several
If you select several employees or several projects, the distribution depends on the planning type. A total, that is Hours with Over the period or Person days, is divided evenly among all selected employees and projects. Hours with Daily apply to each single combination. Percent applies to each selected person. With several projects, you also choose Total, in which case ZEP divides the percentage among the projects, or Per project, in which case it applies to each project. Below the value field, ZEP shows live what this means in hours, for example per employee or per project.
Comment on a Planning
If the setting Record remarks for plannings is active in the basic settings, the form shows the field Comment below the value. There you can note up to 255 characters, for example the work content or an agreement. The comment appears in the tooltip of the bar.
Resolving Overlaps
If a planning on the same planning level already exists in the selected period, that is, on the same project or, with tasks shown, on the same task, ZEP reports an overlap and lists the affected people with their existing plannings. You then have to decide how to proceed.
Add on top adds the new value to the existing planning.
Replace overwrites the existing planning with the new value.
Saving stays blocked until you have chosen one of the two. If adding on top would exceed the maximum of the selected unit, ZEP points this out and suggests replacing instead or reducing the value.
Note: If a person is planned on the project and on one of its tasks in the same period, this does not count as an overlap. Both plannings count in full, for example towards the person’s utilization and the planned hours of the project. If this exceeds their capacity, ZEP warns as usual.
Validation Messages
While you fill in the form, ZEP checks your entries continuously in the background. The check distinguishes between errors, which prevent saving, and warnings, which merely point out a consequence.
Errors
ZEP collects errors in a red box above the form and blocks saving. They occur when the planning would not be possible in practice. The message Metrics could not be updated is a different matter: it appears in a window of its own after saving. The planning has been created in that case, only the key figures in the sidebar are out of date until you reload the view.
Message | Cause |
The period is outside the employment period of the person | The period partly falls outside the employment period |
The employee is not continuously assigned to the project | The project assignment does not cover the period fully |
The period is outside the project duration | The project has no duration in this period |
The period contains no working days | The period consists only of non-working days, public holidays, or absence |
The period contains only days of absence for [Name] | All working days in the period are absences |
Warnings
Warnings sit in a separate yellow box and can be ignored. They point out that the planning is possible but exceeds a limit. With many messages the box becomes scrollable.
The planning exceeds the capacity of the person.
The planning exceeds the daily standard working hours of the person.
A warning names the project whose planned hours your entry exceeds. If they were already used up beforehand, ZEP states instead that they have already been exceeded. Both warnings appear only if planned hours are stored for the project.
For a planning on a task, ZEP reports in the same way that the planned hours for task [name] will be exceeded or have already been exceeded, provided planned hours are stored on the task. The check also covers the parent tasks, and the message then names the affected task.
Editing a Planning in the Board
You change existing plannings directly on the timeline without opening the form. You move a bar, drag its edges to make it longer or shorter, and use the handle to adjust its height and therefore its value. Percentage values move in steps of ten, hour values in steps of one.
Every change is saved immediately. If someone else changes the same planning at the same time, ZEP detects this and reloads the view with the current state instead of overwriting the other change.
A bar cannot be dragged onto days on which the person is absent for the whole day. This applies to moving it as well as to stretching it over the edge.
Note: When dragging in the board, the upper limit for percentage values is 100 per cent, and for hour values it is the longest regular working day within the period of the planning. Enter higher values through the form, where the usual limits apply.
Assigning Employees and Projects
If a person is not yet assigned to the project, you can add the assignment directly from the planning without leaving the view. Depending on the view, the button is called Assign Additional Employees or Assign Additional Projects. If you may also add placeholders to a project, you find the entry there in the menu of the Add icon (person with plus).
In the dialog you define whether the assignment applies to the project duration or to a Custom Period. The first option is called Project duration when you assign employees to a project, and Respective project duration when you assign projects to a person. The first custom period is prefilled with today through one month ahead. Up to three periods are possible. You add another one with Add another period once all existing ones have an end date. If prices are stored, you additionally choose the price group. Without a choice, the default price group of the person applies. In the Planning field you can optionally enter a percentage. The field stays greyed out as long as the chosen basis has no end: with the project duration when the project has no end date, with a custom period as long as no period carries an end date. The tooltip on the field then reads Only possible with "Custom Period" for projects without an end date. The choice of period itself stays available.
Note: The assignment is saved as a regular project assignment and therefore also applies outside Resource Planning. For a planning to be created along with it, at least one period needs both a start and an end date. ZEP names the projects where this is not the case in a yellow notice and skips the planning for them, but still assigns them.
Planning with Placeholders
A placeholder stands for a person who has not been decided yet. It lets you plan the demand of a project before you know who will take it on. Later you staff the placeholder with an employee, and ZEP transfers the hours to that employee’s planning. A placeholder always belongs to exactly one project.
You add placeholders in the planning of a single project, for example on the project detail page in the Planning tab. In the Project planning view, their plannings appear as bars in the lane of the respective project. Adding, planning and staffing placeholders is open to anyone who may edit the plannings of the project, that is, who has the entry Plan Data & Resource Planning in the roles and permissions matrix.
Adding a Placeholder
In the header of the sidebar, click the Add icon (person with plus) and choose Add placeholder. If this is the only entry, the icon opens the dialog directly. In the Description field you give the placeholder a name, for example the role you are looking for. Under Target profile you describe who would fit:
Department: only if the Departments area is active.
Price Group: only if prices are stored. With a price group, the hours of the placeholder count towards the planned revenue of the project.
Skills with minimum level: with Add skill you choose a skill and the level from 1 to 5 that should at least be present. Skills require HR Management and the permission to view skills. HR Management is included in ZEP Business. Without HR Management, you plan placeholders with a description, department and price group.
Placeholders always appear at the end of the list, below the employees. After saving, ZEP reports that the placeholder has no planning yet. With Schedule in this notice you open the form for the current working week. You change the description and target profile later by clicking the name of the placeholder. You also delete it there, together with all of its plannings.
Planning the Demand of a Placeholder
You plan a placeholder like a person through the form, or you drag the bar in its row. In the form, the placeholders of the project appear in the selection of people in a separate group Placeholder. As soon as a placeholder is selected, Planning offers only Hours and, if activated in your ZEP, Person days. The notice Placeholders are planned in hours only points this out. If the project shows its tasks, you also choose the project or a task for the placeholder under Planning level.
A placeholder has no standard working time. ZEP therefore spreads its hours evenly over the weekdays Monday to Friday in the period, with at most 24 hours per weekday. In the board you move a bar or drag it longer or shorter. The total hours stay the same, only the hours per day change. If you drag the bar in height, you change the hours per day and therefore the total hours as well. Clicking the bar opens the Edit Planning window with the name of the placeholder.
The hours of placeholders count towards the scheduled hours of the project. In the header of the sidebar, ZEP shows the share Unfilled under Total scheduled. If planned hours are stored for the project, ZEP also warns for placeholders when they are exceeded. If all plannings of a placeholder lie in the past, ZEP marks it with Period is overdue.
Staffing a Placeholder
Once it is clear who will do the work, click Staff in the row of the placeholder, or Staff placeholder in the window of one of its plannings. The link appears as soon as the placeholder has at least one planning. The dialog uses the target profile as filters: the department including its sub-departments, the price group as the default price group of the person, and the skills with their minimum level. You can adjust the filters or remove them with Reset all filters.
The list shows employees who are employed for the entire period and whom you may assign to this project, or who are already assigned to it. At the top are the people who cover the demand in full in every week (Available), followed by Partially available and Not available. If nobody fits, ZEP suggests removing a filter or lowering a minimum level and states how many people would then fit. For the selected person you see on the right the availability by calendar week, the matching skills, and the existing planning on this project.
With Staff placeholder, ZEP transfers all plannings of the placeholder to the person as hour values. ZEP spreads the hours over the days on which the person works and is not absent for the whole day. If the person is not yet assigned to the project in the period, ZEP assigns them, with the price group from the target profile or otherwise with their default price group. If the demand sits on a task that only assigned employees may book on, ZEP also assigns the person to that task, provided you may maintain the project members, and says so in the success notice. Otherwise ZEP points out that the person still needs to be assigned to the task before time can be booked on it. The placeholder then disappears from the list.
Note: If the person has not a single working day in one of the periods of the placeholder, it cannot be staffed with them. If they already have plannings on this project in the period, you choose between Add on top and Replace, as in the form.
Undoing a Staffing
Right after staffing, the success notice offers the Undo button. Later you open one of the resulting plannings instead. The window then shows Staffed from placeholder "Name" and offers the Undo staffing button. ZEP deletes the person’s plannings from this staffing and restores the placeholder with its plannings. A project assignment that was only created by the staffing is withdrawn by ZEP, as long as the person has neither booked time nor further plannings in it.
Note: The staffing can no longer be undone if existing plannings were added to or replaced during staffing, or if the resulting plannings have been changed since. ZEP states the reason in the window of the planning.