Resource Planning displays plannings as bars on a timeline. Depending on where you enter, you see a single person, a single project, or several of them side by side. This article describes how the view is structured and how you adapt it to the way you work. How to create a planning is described in Creating Plannings – Resource Planning.
Note: This article describes the new Resource Planning, which appears in ZEP as the main menu item Planning. If your main menu also contains Work packages, you are still working with the previous resource planning. Its features are described in Feature Overview – Scheduling and Work Packages.
Entry Points to the Planning View
There are five ways into the planning. They differ in what sits on the lanes of the timeline: either projects or employees.
Entry point | Lanes | Use |
Planning > My Planning | Your projects | Keep track of your own planning |
Planning > Employee planning | Employees | Compare workload across the team and find bottlenecks |
Planning > Project planning | Projects | Weigh several projects against each other |
Employee detail page > Planning | Projects of this person | Plan one person across all their projects |
Project detail page > Planning | Employees and placeholders of this project | Plan one project across everyone involved |
Which filters a view offers depends on what sits on the lanes. Views with project lanes let you filter by project, views with employee lanes by person.
Structure of the View
Every planning view consists of three areas: the sidebar with the key figures, the timeline with the planning bars, and the utilisation strip below it.
Sidebar with Key Figures
The key figures for the head of the view are on the left. For a person these are the available and the open hours together with their standard working time, for a project the duration as well as the planned hours and the hours still open. If no planned hours are set on the project itself, ZEP uses the sum from the tasks, exactly as it does elsewhere in ZEP. Only when nothing is stored there either does the sidebar report that no planned hours exist. The width of the sidebar can be adjusted.
Timeline with Planning Bars
The timeline is on the right. Each bar represents the planning of one employee on one project or task across a period. The bars show their value directly and can be moved, changed in length, and adjusted in height. From a duration of eight days onwards, the date is shown on the bar as well. Areas that cannot be booked, such as weekends, public holidays, absences, or days outside the employment period, are marked separately. They sit as a layer above the timeline, and the bars underneath remain movable. In the project views, ZEP additionally marks the days on which a person is planned beyond their available hours: contiguous overload days get a red band with a warning triangle, and the tooltip gives the reason as The available hours have been exceeded. The calculation runs per person across all projects, so the overload may come from a project that is not visible in this view at all.
Placeholders for demand that is not yet staffed appear in the planning of a single project at the end of the list, below the employees. In the Project planning view, their bars lie in the lane of the respective project. If placeholders of a project are overdue because their period has ended without anyone staffing them, the project card shows their number, for example 1 placeholder overdue. How many of the scheduled hours are still unfilled is shown in the planning of the single project, in the tooltip in the header of the sidebar under Unfilled, as long as demand is still open. How to add and staff placeholders is described in Creating Plannings – Resource Planning.
Utilisation Strip
Below the timeline, each employee has a strip showing the daily workload as a column. Up to one hundred per cent the column stays green. Between one hundred and one hundred and forty per cent it gets a red border, and from one hundred and forty per cent it is fully red. The height is capped at ten hours so that individual outliers do not render the display useless. The tooltip names the planned and the available hours. Absences also appear in the strip, full-day ones as well as half or hourly ones, each with the abbreviation of the absence reason and a tooltip. This way you recognise a low utilisation immediately as an absence rather than as a planning gap.
Note: Workload is calculated against actual availability. Absences and public holidays reduce the available hours and therefore increase the workload, even though nothing about the planning itself has changed.
Adapting the View
Use the gear icon Change view in the header to set how finely the timeline is resolved and how tall the rows are. The period the key figures are based on is chosen in the header of the sidebar instead. Use the Today button at the top left of the board to jump back to the current day.
Timeline, Column Width and Row Height
In the Period area, under View you choose whether a column of the timeline shows a Day or a Week. Under Days you define whether only the Work week or the full Week including the weekend is shown. Below that you set the Column width to Compact, Medium or Wide and the Row height to Short or Tall. All changes take effect only when you select Apply, so you can set several options together. Reset restores the defaults: Day, Work week, Compact and Tall.
Period for Workload Calculation
This period determines what the key figures in the sidebar refer to. You choose between the Project Period, a Custom Period, and a fixed Date. For a custom period you combine Current or Next with week, two weeks, month, quarter, half year, or year. Next two weeks includes the current week as well. The project period is available only if the project has both a start and an end date. Without a choice of your own, ZEP calculates the current month.
Filters and Favourites
Filters limit which lanes are shown at all. Favourites keep a combination you have set up for the next time you open the view.
Filters
Depending on the view, filters by employee, project, project status, and project type are available, and in the multiple views additionally by project management. Where the Departments area is active, the department filter is added in the multiple views. Two further filters stay hidden until you need them: Employee category in the employee view and Project category in the project view. You bring them into the filter row with Add filter and remove them again with Delete filter. A value you set is kept as long as the filter stays visible. In addition, toggles hide lanes selectively, for example Employees with available capacity, Employees with planning, or Projects with open planned hours. In the planning of a single project, the toggle Hide Placeholders hides the placeholders. If tasks are shown, filters by task are added, see Filtering by Tasks.
Note: In views with project lanes, only active projects are shown by default. If a project is missing, check the status filter first.
Favourites
You can save a combination of filters and view settings as a favourite. Favourites are kept separately per planning page, so the favourites of the employee view do not appear in the project view. In the single views a favourite can additionally be tied to the respective project or person.
Planning on Tasks
If planning on tasks is allowed in the basic settings, you plan not only on a project as a whole but also on its tasks. You show the task level per project. Tasks with subtasks are displayed across any number of levels.
Showing the Tasks of a Project
In the planning on the project detail page, there is an icon at the top of the sidebar with the tooltip Show tasks. It appears if the project has tasks and you may edit the entry Plan Data & Resource Planning for this project in the roles and permissions matrix. The same icon, then with the tooltip Hide tasks, removes the level again. If a planning or placeholder demand sits on a task of the project, ZEP hides the icon and the tasks stay shown.
Layout with Tasks Shown
The timeline then follows the task tree of the project. The first row is called Project level and holds the plannings on the project itself. Below it there is one row per task, and you expand and collapse subtasks. How employees appear is chosen with the gear icon Change view under Show employees:
In the task bar is the default. The plannings of a task sit as bars directly in its row.
As a separate row shows only the total in the task row. When you expand the task, each employee gets a row of their own below it, where you edit the bars. The total bar itself cannot be edited, its tooltip says aggregated, editing at task level. In the expanded row of a task, however, you can draw a new planning. ZEP then opens the form for a new planning with the task already filled in. The same applies to the expanded row Project level, where the planning then applies to the project itself. Existing bars are not dropped on an expanded row but in the rows of the employees.
Key Figures per Task
The sidebar shows the planned hours of each task and the hours scheduled on it. If a task has subtasks, the sum sign ∑ appears before its scheduled hours. It adds up the hours of the task and all its subtasks and turns red as soon as the total exceeds the planned hours of the task. The tooltip breaks down how many hours sit directly on the task and how many come from sub-levels. If the planned hours of the subtasks exceed the plan value of the task, ZEP also shows a warning symbol. In the header of the sidebar, the tooltip splits the total scheduled hours into From tasks and Without task.
Tasks in the Employee Views
In My Planning and on the employee detail page, the tasks of projects whose task level is shown appear. With the gear icon Change view you choose under Show tasks whether each task sits As a separate row below the project, which is the default, or whether the bars stay In the project row. Plannings without a task sit in a row of their own called Without task. By default, the view shows only tasks with a planning. Use the filter Tasks without planning to add the rest.
Filtering by Tasks
In the planning on the project detail page you filter by individual tasks with Task, displayed as a tree. In Project planning and in the employee views, the filter Projects is a tree as well: below each project with tasks shown sit Project level and the tasks, so you can select individual levels.
Note: The settings Show employees and Show tasks only affect projects with tasks shown. All other projects keep their usual display.
Absences and Public Holidays
Absences and public holidays are shown as separate cells in the timeline so that you can see immediately which days someone is unavailable while planning. On days without working time, no planning is possible. Which absence reason is shown in detail depends on your role.
If an absence is added, changed, or removed later, ZEP adjusts the affected plannings from today onward. ZEP distributes plannings in hours across the remaining working days so that the planned effort is preserved. You define who is notified about this in the basic settings.
Tip: The Project planning view does not show absences per employee because projects sit on the lanes there. Switch to the Employee planning view or to the employee detail page to see absences.